Client: Power Station

  • Location: Chelmsford, Essex
  • Duration: 2 Months

Working with the refurbishment contractor, we undertook a series of new air conditioning and heat recovery ventilation installations across two floors.

With the works being undertaken on a power plant site key our key focus was health & safety. With meticulous planning and extensive Risk & Method Statements we  were able to navigate the H&S protocols of the power plant, adjusting our procedures and practices to complete the works in a timely, yet safe, manner.

Our installations comprised of 2no Daikin R32 Heat Recover VRV heat pump air conditioning systems. The final design comprising 4-way blow cassettes and wall mounted indoor units, of varying capacity, to suit the layout rooms sizes. We also installed a Daikin Wall Mounted AC system to the  Server room. Fresh air and simultaneous extraction is being delivered to each floor via VAM2000 MVHR systems linked to ductwork, dampers and grilles across both floors. Each system fitted with a heater battery for improved winter efficiency.

Project time frame: 2 months.

Copyright © 2025 Mountair

Marketing by Unity Online