Client: NHS Hospital
- Location: London
- Duration: 3 Months
Working with the refurbishment contractor, we are undertaking a series of alterations, new installations and improvements to the air conditioning and ventilation plant.
This is an extremely fast paced project, ongoing design and build process, incorporating everything from new air source heat pump installations to MVHR systems for specific areas and a brand new Air Handling Unit being craned on to the roof. We have worked closely with the main contractor to deliver this project on time for the Trust.
Our installations comprise of a 25 unit Daikin VRV system, installation of extract systems to toilets, bathrooms & laundry/kitchen areas, Daikin VAM Mechanical Heat Recovery Ventilation systems to the office areas. We have decommissioned and stripped out the existing redundant air handling unit which serves all 3 floors, ready for the new AHU we are having craned on to the roof. We have installed 100’s of meters of new ductwork, pipe work and cabling with dampers, fire smoke dampers and grilles to serve the whole 2nd floor.
Project time frame: Rolling Project over 3 months