Client: Champagne Bar (Commercial/Leisure)
- Location: Canary Wharf, Docklands
- Duration: 1 Months
Installation of 8no Mitsubishi Electric cassette systems and MVHR ventilation systems to the open void. This work was undertaken alongside the building contractor, developing the space into a chic champagne bar with an urban feel. Our brief was to provide heating and cooling to the space, as well as lots of mechanical ventilation to ensure the busy space would remain comfortable and fresh.
Project time frame: Rolling Project over 1 months