Air Conditioning Inspections (TM44)

Air Conditioning Inspections

The facts:

  • Building owners and managers of air-conditioning systems with an effective rated output of more than 12kW currently have a statutory obligation, under the Energy Performance of Buildings Directive (EPBD), to ensure their systems are inspected every five years by an accredited inspector.
  • The First inspection of all existing systems over 250 kw cooling capacity should have been completed by 4th January 2009.
  • New systems installed over 12 kW installed after January 2008 must be inspected within 5 years of being put into service.
  • A new inspection certificate will be required every 5 years

Does your system requirine an inspection?

Only air conditioning systems with an effective rated output of more than 12kW are affected bythese regulations. This will include systems consisting of individual units which are less than 12kW but whose combined effective rated output

Purpose of an Inspection

The purpose of the Air Conditioning Inspection Report is to provide basic information regarding the efficiency of the air-conditioning systems that are controlled. This will form the basis for  advice on how to improve the energy efficiency of the system, to identify opportunities to save energy and to reduce operating costs. This inspection will be undertaken by an independent Assessor.

Mountair can assist you with your TM44 inspection, ensuring you are fully compliant with all government regulations both now and in the future.

To arrange a TM44 inspection or to obtain a quote please call us today on 0800 019 6025.

Customer feedback

Book an Air Conditioning Inspection – Call 0800 019 6025 today

Our knowledgeable customer services team are waiting to talk to you
Contact Us